SPECIAL NOTICE TO STAKEHOLDERS ABOUT VRN CLOSURE IN GOLDEN GROVE
NOTICE TO STAKEHOLDERS AND THE GENERAL PUBLIC OF CONTINUED WORK ON VALLEY ROAD NORTH (VRN), IN GOLDEN GROVE, WHICH WILL CAUSE DELAYS AND INCONVENIENCE.
Special Notice is given that on Saturday 23rd November 2024, there WILL BE TOTAL CLOSURE of the section of Valley Road North (just north of the Christian Union Church in Golden Grove) to upgrade the existing culvert.
Vehicular Traffic traveling south or north on VRN, in the vicinity of the Christian Union Church, SHALL follow the instructions of the flag persons and follow the diversion signs through Golden Grove, as shown on the attached diversion plans.
Alternatively, vehicular traffic between St. John’s and the Nut Grove Football Field are encouraged to use the NUT GROVE MAIN ROAD, and avoid the diversion altogether.
This closure will be from 7:00 am to 6:00 pm on the day indicated.
C O Williams sincerely regrets the inconvenience. The road work is a part of the Second Road Infrastructure Rehabilitation Project being carried out by the Government of Antigua and Barbuda.
Stakeholders are asked to make adjustments to their travel plans to allow for delays.
Telephone queries can be made by calling to C O Williams Project office at 562-9573.
Advertise with the mоѕt vіѕіtеd nеwѕ ѕіtе іn Antigua!
We offer fully customizable and flexible digital marketing packages.
Contact us at [email protected]
Living in Antigua for over 30 years and no idea what kinda instruction are these. North of a church that everyone should know <.<
Its the same roads they’re fixing all over again, with no proper drainage n side walks.
What about allsaints road, dont you all think it needs fixing as well. Too much bumpy bumpy patch work. You guys need to bring in proper engineers for the roads. Its embarrasing with the ROADS & WATER system here.
Its the same roads they’re fixing all over again, with no proper drainage n side walks.
What about allsaints road, dont you all think it needs fixing as well. Too much bumpy bumpy patch work. You guys need to bring in proper engineers for the roads. Its embarrasing with the ROADS & WATER system here.
Its the same roads they’re fixing all over again, with no proper drainage n side walks.
What about allsaints road, dont you all think it needs fixing as well. Too much bumpy bumpy patch work. You guys need to bring in proper engineers for the roads. Its embarrasing with the ROADS & WATER system here.
To the north of the church or the south of the church get you all direction straight and the roads were being neglected before the pm treatens the man in charge ,hev been waisting tax payers money and not getting nothing completed the same road is been fix and unfix for the past two years now thats the road i use every day
There are 2 culverts on that road, one immediately south of the church that has 2 culverts and the other 2 houses south of the church that has one. This one need upgrading to 2, and the gutter needs a back wall to stop the erosion. The the gutter to the west of the road need fixing so the water can flow and stop settling that causes a stench.
I live next to one of the culverts that always block up and the water and all garbage flows into and through my yard. Flood out my office and damage my possessions. I have to open my garage door so the water can flow through. I have many pictures of such. The smelly mud that leaves deposited in my garage I have to power wash everytime this occurs.
Please have this corrected once and for all thank you Mr co Williams
I live in the biege and green house please ask me for my input in what happens on this road.
@Positive direction – I ecourage you to call CO Williams and even go to their office. No guarantee they are reading comments on their press release.
@Fed up – We have enough engineers but when they submit the plans to do the work the people in charge want it cut down to save cost and divert money to other thing. This is CO. Williams doing the work, not the govt. Theoretically, less interference when it’s a third party…”theoretically”