NOTICE: Work on Friars Hill Road

1

Reduced Running Lanes / Schedule Road Closure  

Work on Friars Hill Road:

APUA will be constructing new entry pits within phase 2 . Entry pit’s #13 will be located at Epicurean Drive and #17 will be located in front of Caribbean Union Bank.

There will be a scheduled road closure at Summer Lane on 10th October 2018. This is to facilitate APUA’s water and electrical service connections at Summer Lane Jcn. APUA will be working from west side of FHR from Village walk to the Public Cemetery.

Duration: One (1) Week

Lane Closure: N/A

Diversion: Previously stated; also attached

Work on Sir George Walter Highway:

 Formation preparations and base works have begun on western side of Phase 1-; from VC. Bird International Airport Jnc – Solar Energy Farm.

Road users are urged to proceed with caution and observe traffic management signs.

No parking is allowed within or on road near to the construction site.

Text Box: Thank you for your cooperation!! 
 For further information: 
Project Implementation Management Unit:
T: 268-562-9174/6    |    E: pimu@ab.gov.ag

Advertise with the mоѕt vіѕіtеd nеwѕ ѕіtе іn Antigua!
We offer fully customizable and flexible digital marketing packages.
Contact us at [email protected]

1 COMMENT

  1. Shawn Thomas will go down in history as the face of the guy who “mash up” Antigua road an dem. Nar now Friars Hill road mash up. Wonder if it will meet the same fate as Humpty Dumpty

Comments are closed.